RISCONORDO
Public

Risk & Roles

Risk Moves. Who Carries It?

A burden can disappear from a report and remain in someone’s day. Read the improvement side by side with the place the burden was passed to.

Synthetic · Simulation/As of

Who Carries The Wait After The Height Check

This question asks where risk moves when a protection rule on a small building site lowers one danger and raises another. The site is a house frame going up on a narrow street, with a small crew and a site supervisor. A scaffold collapsed at a neighboring site last month, so management added a rule: no one climbs to work at height until a second person inspects the setup and signs it off. The crew works in short windows between material deliveries.

Who Asks
site supervisor who adopted the height check rule
Who Is Affected
finishing crew and the delivery driver who wait on the inspection
Who Can Revise
construction company safety manager who can amend the rule
Risk Reduced

The risk of a fall from an unchecked setup at height went down.

Risk Shifted

Waiting time at the ladder and lost delivery slots now fall on the finishing crew and the delivery driver, and end-of-day pressure now sits with the supervisor running the check.

Traces in This ScenarioInvented, not observed
  • The sign-off sheet shows every climb recorded with a check before it, and no falls or rescues on the site since the rule began.

  • Finishers wait at the base of the ladder during the afternoon, and a concrete delivery idles at the gate until the inspection is finished.

The Assumption

The inspection rule spreads protection evenly across everyone on the site.

The Design Must Stay Revisable

Look again if a near miss happens at the ladder late in the day, or if deliveries stop being scheduled to this site.

Redesign the Roles