The question is whether a snag list closed by a building inspector may be reopened when damp returns in the same place. A snag list is a written record of flawed or unfinished work on a small building site. Items are closed one by one as each repair is accepted. A building inspector signs the closeout, meaning the accepted repairs count as complete and the handover can proceed. Damp is water in a wall or floor that shows as staining or flaking paint. A caretaker checks the finished flats after handover and logs anything that looks wrong.
묻는 사람
site manager who wants the handover to stand as closed
영향을 받는 사람
caretaker and future flat residents who live with damp under the pipework
고칠 사람
The building inspector who signed the closeout and can reopen it
이 장면의 흔적실측이 아닌 합성 자료
↳
The site manager closed all eight plastering items and the building inspector signed the closeout a week before handover.
↳
The caretaker logged damp patches and flaking paint under the same pipework two months after handover.
가정
An item closed after a second inspection does not need to be considered again.
해석이 갈리는 곳
차이를 남겨 둔다
A
The Closeout Was Sound
The building inspector accepted each repair with a second look, which is the strongest check available on a small site. The damp may come from plumbing or from weather, which are outside the plaster work that was accepted. The caretaker is describing a new defect, not a return of a closed one. The closeout does not need to reopen.
B
The Closeout Confirmed Paperwork Only
The second inspection accepted that each item had been touched, not that the underlying work would hold. Damp under the same pipework in the same place points back to work that was never sound. The closeout reduced visible defects at handover while leaving the fault in the fabric. The inspector should look at the original item again.
위험이 옮겨 간 자리
줄인 위험−
risk that visible unfinished work reaches handover unexamined went down
옮긴 위험↗
the caretaker and residents now carry the risk of damp that nobody traces back to the accepted repair