This question asks when a check that has been passed on a building site must be reopened. The site is a small one: a two-story rear extension on a terrace house, run by a foreman and a crew of five. Setting out means transferring wall positions from the paper plans to the ground so openings land where the frames will fit. The foreman checks the wall line each morning, records each reading on the daily sheet, and signs it off if the reading sits within tolerance, the small allowed gap between the true line and the built one.
Who Asks
The site foreman who signs the daily setting-out sheet
Who Is Affected
Home owner who pays for the wall to come down and be rebuilt
Who Can Revise
Project architect who may direct the line to be re-set from the plan
Traces in This ScenarioInvented, not observed
↳
The daily setting-out sheet for the past fortnight shows every reading passed and signed, each within tolerance.
↳
A pre-made window frame arrives and does not fit its opening; the fitter reports the opening sits a full course off the plan line and the wall must be partly taken down.
The Assumption
A reading within tolerance needs no further examination, so passing each check closes the line for that day.
Where the Readings Split
Keep the difference visible
A
Each Day Was Judged Correctly
Each morning the foreman judged the work against the plan and the allowed gap, and each day it met the standard. The frame failure came from movement after those checks, or from the frame itself, and is a new problem to fix. Reopening fortnight-old passes would stop the work without changing what was built.
B
The Chain Should Have Reopened
Every small deviation sat in the same direction and was carried into the next morning as the starting point. Each pass was correct alone but kept the line drifting. The signal to reopen was the same-direction pattern across sheets, and no one held that view. The cost of taking the wall down lands on the owner for a judgment that was never looked at again.
Follow the Risk
Risk Reduced−
Day-to-day argument over tiny readings went down, and the crew kept building.
Risk Shifted↗
The home owner now carries the cost of demolition and rework for drift that no single day's check would show.